Intumescent coating is the modern standard for structural steel fire protection: a thin paint film that expands up to 50 times its thickness when exposed to fire, forming an insulating char that keeps steel below its critical failure temperature. EJAD has applied over 1.5 million m² of intumescent coating across Saudi Arabia — on stadiums, data centers, factories and universities. Below are the certified intumescent systems we apply, with full documentation for each.
Jotun SteelMaster (water-based)
- SteelMaster 600WF — water-based, Certifire CF5631 — used at Amazon AWS & Dammam University
- SteelMaster 900WF — water-based, Certifire CF6140 — used at MODON
- SteelMaster 1200WF — up to 120 min, LEED letter, Certifire CF5243 — used at Aramco Stadium, MODON & Dammam University
- SteelMaster 1200HPE — high-performance, Certifire CF5857
Jotun SteelMaster (solvent-based)
- SteelMaster 90SB — Certifire CF10246
- SteelMaster 120SB — up to 120 min, Certifire CF845
Hempel
- Hempafire Optima 500 — low film thickness — used at Tamer Logistics Park (BS 476)
- Hempafire Pro 400 — optimized for 60–90 min ratings
- Hempacore One — solvent-based thin-film intumescent
PPG
- Steelguard 651 — waterborne, up to 120 min, CE marked, EN 13381-8 / BS 476
Jazeera Paints
- Firedamp W3 — water-borne, BS 476 Part 21 (Warringtonfire), up to 4 hours
← Back to the Coating Library · Need help selecting a system and fire rating? Talk to EJAD engineers.
Why source intumescent coating documentation from EJAD?

Every intumescent coating document in this library belongs to a system EJAD actually applies on site. We are not a directory — we are the applicator: our certified teams have protected over 1.5 million m² of structural steel across Saudi Arabia, and the intumescent coating datasheets, certificates and guides here are the same documents our engineers submit to consultants and the Saudi Civil Defense on real projects.
Need help selecting a system?
Specifications, fire ratings and loading tables differ from project to project. Talk to EJAD engineers for a free consultation on intumescent coating selection for your structure — we respond with the right system, the right documentation and a realistic program.